immediately after your online check-out. Just click on the link indicated
and you can open or save your drawings to your computer. If you would
rather wait to download your drawings at a more convenient time or place, a
link to download drawings will be sent to the e-mail address you provided at
check-out. You will have 48 hours to download your plans. You can download
the drawing files as many times as you want in those 48 hours. If you want
full size sets of the drawings, just send an electronic copy to your local
printer and he can make you as many copies as you need. See the section
below about “Electronically Reproducible Drawing Files” for information
about saving and printing drawings.
These drawings show details that are the result of decades of refinement and
simplification that allow hired craftsmen or owner/builders to create
proportionate, authentic looking ornamentation and historic detailing
without wasted time, materials or mental anguish. They can save you
thousands of dollars and hundreds of hours.
As
soon as you think you have found a suitable lot or subdivision and have
some sort of building plan, you need to make an appointment for a
“Pre-design Meeting” at your local Building, Planning and Zoning
Department. Here’s what you need to take to that meeting: 
decade
this national code has replaced many of the older regional codes that used
to exist in the United States, such as, the “BOCA Code”, the “Southern
Standard Building Code”, the California Building Code and the “Uniform
Building Code”. So most municipalities will recognize the IBC as their
design standard.


e
plan locates the actual building position on the property, taking note of
desirable view corridors, setbacks, obstacles, utilities, sidewalks and
roads. The house designer, utilizing a survey drawing prepared by a local
surveyor, normally prepares the site plan. The site plan can be prepared
from a plat map or even a dimensioned sketch but either way the essential
elements noted above for a survey should be shown on the Site Plan.
1500 psf. We require that all foundations extend a minimum of 12” into
undisturbed “Virgin Soil”. These are IBC worst-case conditions and
therefore should be safe in nearly all cases. However, some local Building
Departments require a site soils analysis to be a part of a Building
Application. When they do, it will be necessary for you to employ a local
Geotechnical Engineer. Your local building department should have a list of
approved engineers on hand. It could cost thousands of dollars for
this expense so remember to check with the local building department.;
We maintain engineering licenses in California, Florida, Michigan, Ohio and
Kentucky. We also are certified nationally with the “Structural Engineering
Certification Board” but some states, in which we are not registered, may
require a local engineer to seal your plans. In that case you will need to
ask for a list of local engineers to assist with the necessary details and
certifications on our plans. Normally this will involve the local
engineer reviewing our plans to see if they need any further strengthening
for local conditions. If he believes so he might add additional
drawings to your building set.
There are a few things you should know about
buying windows through window retailers. The mark-up on quality windows
is high. If you don’t get a 40 to 50% discount on a full set of
windows, try another retailer. Second, what you ultimately pay for a
window has little to do with the base price of that window. It’s those
little things that are added on that make it expensive. Here’s
an example: We recently bought 8 casement windows like the one shown
pictured. It’s a large Marvin 28” x 64” Insulated Casement that can be
bought with any number of upgrades. We chose from the following (approx
prices):
_______________________________________________________________________________________________________________
________________________________________________________________________________________________________________